Apply as sales agent

4.2 Injection Parameters on injection molding

Main injection Parameters on injection molding. Including the Injection-Pressure Ramp, Injection-Flow Ramp, Injection-Pressure, Injection-Pressure, Hold pressure – Pressure Ramp, Hold pressure – Flow Ramp, etc.

Injection Parameters setting guide

 
 

No. Injection-Pressure Ramp
1 stage Injection 1 pressure Ramp – The increase slope of injection pressure buildup time.
2 stage Injection 2 pressure Ramp – The increase slope of injection pressure buildup time.
3 stage Injection 3 pressure Ramp – The increase slope of injection pressure buildup time.
4 stage Injection 4 pressure Ramp – The increase slope of injection pressure buildup time.

 
 

No. Injection-Flow Ramp
1 stage Injection 1 flow Ramp – The increase slope of injection pressure buildup time.
2 stage Injection 2 flow Ramp – The increase slope of injection pressure buildup time.
3 stage Injection 3 flow Ramp – The increase slope of injection pressure buildup time.
4 stage Injection 4 flow Ramp – The increase slope of injection pressure buildup time.

 
 

No. Injection-Pressure
1 stage /
2 stage /
3 stage Injection mold setup flow – Speed during mold adjustment mold height adjustment
4 stage Injection mold setup pressure – Pressure during mold adjustment mold height adjustment

 
 

No. Injection-Movement timing
1 stage /
2 stage Injection pressure increase timing delayed
3 stage Injection done valve stop delayed timing – Injection valve stop delayed after injection done
4 stage Injection timing delayed – Delay after the nozzle input, before the injection

 
 

No. Hold pressure – Pressure Ramp
1 stage Hold pressure 1 pressure Ramp – The increase slope of hold pressure1 pressure buildup time.
2 stage Hold pressure 2 pressure Ramp – The increase slope of hold pressure2 pressure buildup time.
3 stage Hold pressure 3 pressure Ramp – The increase slope of hold pressure3 pressure buildup time.

 
 

No. Hold pressure – Flow Ramp
1 stage Hold pressure 1 pressure Ramp – The increase slope of hold pressure 1 speed buildup time.
2 stage Hold pressure 2 pressure Ramp – The increase slope of hold pressure 1 speed buildup time.
3 stage Hold pressure 3 pressure Ramp – The increase slope of hold pressure 1 speed buildup time.

 
 

Subscription

    Keep in touch with POWERJET and get our latest news:

    Your email address is safe with us.

    Contact Us

    Address: NO.5 Chuangxin Xi Road,
    Leping Industrial Park of Shanshui,
    Foshan City, Guangdong, China
    Phone: +86-139 2508 7612
    Fax: +86-757-8669 7566
    Email: marketing[@]powerjet-machinery.com