Charge parameters on injection molding machine. Including the explanation of Charge – Pressure Ramp, Charge – Flow Ramp, Charge – pressure / flow, Charge – Movement time, etc.
No. | Charge – Pressure Ramp | ||
---|---|---|---|
1 stage | Charge 1 stage pressure Ramp – The increase slope of charge pressure buildup time. | ||
2 stage | Charge 2 stage pressure Ramp – The increase slope of charge pressure buildup time. | ||
3 stage | Charge 3 stage pressure Ramp – The increase slope of charge pressure buildup time. | ||
Suck back | Suck back pressure Ramp – The increase slope of suck back buildup time | ||
No. | Charge – Flow Ramp | ||
---|---|---|---|
1 stage | Charge 1 stage flow Ramp – The increase slope of charge 1 speed buildup time. | ||
2 stage | Charge 2 stage flow Ramp – The increase slope of charge 2 speed buildup time. | ||
3 stage | Charge 3 stage flow Ramp – The increase slope of charge 3 speed buildup time. | ||
Suck back | Suck back flow Ramp – The increase slope of suck back buildup time. | ||
No. | Charge – pressure / flow | ||
---|---|---|---|
1 stage | Charge mold setup pressure – Charge pressure during mold height adjustment | ||
2 stage | Charge mold setup flow – Charge speed during mold height adjustment | ||
No. | Charge – Movement time | ||
---|---|---|---|
1 stage | Charge done valve stop delayed timing – Charge done,charge valve stop delayed | ||
2 stage | Suck back done valve stop delayed timing – Suck back done, suck back stop delayed | ||